The Complete Ontario Home Building Checklist: Lot to Keys, Nothing Skipped
The Complete Ontario Home Building Checklist: Lot to Keys
Every item on this list is something I have watched someone skip. Print it, tick it, and argue with your builder about it. That is what it is for.
Before you buy the lot
Before you design
Before the permit
During construction
Before you move in
First year
The guides behind each stage
Lot: 49 things to check before buying a lot and is this lot buildable. Design: the seven decisions that set the cost. Permit: how to get a building permit. Contract: what a good contract includes. Construction: the inspection sequence. Move-in and warranty: what Tarion covers. The long version of all of it is the free book, How to Build a Home Without Going Broke.
Related guides on this site
Sources and further reading
Questions people ask
What is the most commonly skipped step in building a house?
The conditional offer on the lot. People buy land on a handshake and find out about the floodplain, the easement or the failed septic test after closing. A condition costs nothing.
In what order should I hire people?
Builder or at least a builder conversation first, then the designer, then the engineer and the heat loss, then the trades through the builder. Hiring the designer first is how plans come in over budget.
How do I keep the list useful during the build?
Print it, put it on the fridge, and review it with the builder at each draw. The checks under "during construction" are the ones that keep the money straight.
Building in Simcoe County or on Georgian Bay?
We are ICFhome.ca, a family builder in Tiny Township with 45 years of custom homes behind us. Pick the path that matches where you are.
Reviewed and updated October 2026. Costs are Ontario ranges, not quotes; code references are to the Ontario Building Code in force at that date.