The timeline, phase by phase
| Phase | Typical time | What’s happening |
|---|---|---|
| Design & drawings | ~3–6 months | Concept, detailed drawings, engineering, finish selections |
| Permits & approvals | ~2 weeks–4+ months | Building permit; conservation authority if the lot is regulated |
| Construction | ~8–14 months | Site work, foundation, framing, mechanicals, finishes, final inspection |
A simple, decisive project lands near the short end; a large or complex custom home near the long end. See the full custom home building guide for the step-by-step process.
What causes the biggest delays
- Permits: incomplete applications and busy departments — see how the building permit process works.
- Conservation-authority approvals when the lot is regulated — these can add months if studies are required.
- Rural servicing: septic design, well drilling and hydro connection lead times.
- Winter weather affecting excavation and concrete scheduling.
- Owner indecision on selections — the most common self-inflicted delay.
How to keep your build on schedule
The fastest builds share a pattern: drawings and selections finished before the permit application, a design that isn’t needlessly complex, financing lined up early, and a builder with an available crew. If you want to move in by a target date, work backward at least two years.
Plan your build timeline
Get a realistic schedule and budget for your specific plan and lot.
Build timeline FAQ
How long does it take to build a custom home in Ontario?
How long is the construction phase alone?
How long does design take?
How long does a building permit take in Ontario?
What causes the biggest delays?
Can you build a house through an Ontario winter?
How can I speed up my build?
Does the build method change the timeline?
Why does a custom home take longer than a production home?
When should I start if I want to move in by a certain date?