How to Compare Kitchen Renovation Quotes in Ontario (Without Getting Played)

Kitchens & BathroomsBuyer’s Guide

How to Compare Kitchen Quotes in Ontario Without Getting Played

Three quotes are only useful if they are quoting the same kitchen. Most are not. Here is how to make them.

I have read more kitchen quotes than I care to count, as the builder who has to make the number work. The expensive mistake is almost never picking the wrong shop. It is comparing a cabinets-only price to an installed price and thinking you found a bargain.

3quotes, one written scope
10lines that hide the difference
10%max over a written estimate, by law
10%deposit Ontario recommends

Why three quotes are usually three different kitchens

You call three shops. Each one sends a designer, or asks you to come in, and each designer draws the kitchen the way their line builds it. Shop A has a 33-inch sink base, so your sink wall gets a 3-inch filler. Shop B does not carry a 15-inch cabinet, so the end of the run changes. Shop C decides you need a blind corner and the other two gave you a lazy susan. Then A quotes cabinets only, B quotes installed, and C includes the countertop template but not the install.

You now have three numbers that differ by $8,000 and no idea why. That is not dishonesty, mostly. It is three people solving your kitchen three ways and nobody asking them to solve it the same way. The fix is to write the scope yourself and hand all three the same piece of paper.

The rule: the shop prices your scope, not theirs. If a shop wants to change the scope, it writes the change as a separate line with its own price, so you can still compare the base kitchen across all three.

Step one: write the scope before anyone measures

Half a page is enough. The cabinet cost calculator on this site builds it for you and you can print it, but the contents are simple:

  • Footage: base run, upper run, pantry or tall units, island length. Measured by you, wall to wall.
  • Grade: builder, mid-grade, premium or custom, in the words from the Ontario cabinet cost guide, so everybody knows what tier you mean.
  • Box spec you want quoted: material and thickness for sides and back. If you do not state it, each shop quotes its own.
  • Door style and finish, by name if you have picked one.
  • Drawers: how many base cabinets are drawer stacks. This alone moves a quote 15%.
  • Hardware: soft-close hinges and undermount runners, stated as required.
  • Trim: crown, light rail, fillers, finished ends, toe kick. Say “include all” so nobody leaves them off.
  • Installation: included, with levelling, scribing and hanging. Say what is excluded: sink, dishwasher, hood, electrical.
  • Countertop: material and whether the shop is supplying it or you are. If they are, template and install as a line.
  • Demolition and disposal of the old kitchen, if it is a renovation.
  • Delivery.
  • Timing: when you want it installed.

Send that to all three with one sentence: “Please quote this scope, installed, before HST, as a line-item list. If you recommend changes, price them separately.” You will be amazed how much the numbers tighten up.

Step two: put the three quotes on one grid

Print this page and fill it in by hand, or copy the rows into a spreadsheet. Every quote gets a column. Every line gets a number or the word “excluded.” The last row is the only one you compare.

LineQuote AQuote BQuote C
Cabinets, as scoped
Box spec quoted (material / thickness)
Drawer stacks (count)
Soft-close and undermount runners
Crown, light rail, fillers, end panels, toe kick
Handles and pulls
Delivery
Installation
Demolition and disposal
Countertop supply
Countertop template and install
Sink and cooktop cutouts
Shop’s recommended changes (priced separately)
Subtotal before HST
HST 13%
Installed total, same scope
Deposit asked
Lead time from final measure
Warranty: boxes / finish / hardware

The ten lines that hide the difference

  1. Installation. Fifteen to twenty percent of the price. The most common reason a cheap quote is cheap.
  2. Trim. Crown, fillers and panels are 6% and are the easiest thing to leave off a first number. “Trim as required” means “not priced.”
  3. The box. A 5/8-inch melamine box with a 1/8-inch back and a 3/4-inch plywood box look the same in a quote that says “cabinets.” Make them write it down.
  4. Drawers. A quote with four drawer stacks and a quote with nine are different kitchens by about $1,500.
  5. Hardware. “Soft-close available” is not “soft-close included.” Undermount runners are a line, not a given.
  6. Handles. Forty-five pulls at $8 to $15 each is $400 to $700 that one quote includes and the next does not.
  7. Countertop template. A fabricator’s measure-and-install is $500 to $1,200 and sometimes appears on the cabinet quote, sometimes on the stone quote, sometimes nowhere.
  8. Demolition. $800 to $1,800. Shops that do not install usually do not demolish either, and the line is silent.
  9. Delivery. Free from the shop in your town. Not free from the one two hours away with the better price.
  10. “Allowances.” Any line that says “allowance” is a number the shop picked so the total looks good. Door hardware allowance $300. Countertop allowance $4,000. Ask what the allowance actually buys and what you want actually costs.

A worked example: the cheapest quote was not

Three real-style quotes on the reference kitchen used across this site (18 ft base, 14 ft upper, 3 ft pantry, 6 ft island, mid-grade painted shaker, quartz). As received, then normalized to the same scope.

LineQuote AQuote BQuote C
As received, before HST$14,200$19,800$17,100
Installationexcluded, add $2,900includedincluded
Crown, fillers, panels, toe kickexcluded, add $1,000includedincluded
Drawer stacks4, scope asks 8: add $90088
Undermount runnersside-mount, add $600includedincluded
Handlesexcluded, add $500includedexcluded, add $500
Demolitionexcluded, add $1,200includedexcluded, add $1,200
Deliveryadd $350includedincluded
Same scope, before HST$21,650$19,800$18,800
Box spec, in writing5/8 melamine, 1/8 back3/4 melamine, 1/2 back5/8 melamine, 1/4 back

Quote A, the “cheap” one, is the most expensive kitchen and has the worst box. Quote C wins on price by $1,000 with a thinner back than B. Whether $1,000 buys you a better cabinet back for twenty years is a decision you can now actually make. Before the grid, you were about to sign A.

Red flags

A total with no line items. “Kitchen as discussed, $18,500.” You cannot compare it, which is the point.
A deposit over 30%. Ontario’s consumer guidance recommends no more than 10% down on renovation contracts. A shop buying material can justify more. A shop that wants half before a final measure is funding last month’s job with your money.
“Price valid today only.” Cabinet prices do not move in a day. Pressure does.
No drawing. A quote without a labelled drawing is a quote for a kitchen that exists in someone’s head.
Cash discount. Usually means no contract, no HST and no warranty when the door peels. The province says the same thing more politely.
Nobody will write down the box spec. Everybody in the trade knows what their box is made of. Reluctance to say is the answer.

What the law gives you in Ontario

Three things worth knowing before you sign, from the province’s own renovation rights page. A renovation contract over $50 has to be in writing. If a written estimate is part of the contract, the final price cannot be more than 10% over it unless you agree to new work or a new price in writing. And a contract signed in your home comes with a 10-day cooling-off period.

For installed work, the Construction Act’s 10% holdback applies, which is the legal reason a good shop’s payment schedule keeps the last 10% until after substantial completion. The Act itself is not bedtime reading, but a shop that has never heard of the holdback has not done much installed work.

What the law does not do is tell you whether $19,800 is a fair price for the kitchen on the drawing. That is the grid’s job, and the cost guide’s, and if you want a second opinion, mine.

Questions to ask every shop, in the same words

  1. What is the box made of, how thick are the sides, and how thick is the back?
  2. Is installation in this price, and what does install exclude?
  3. Are crown, fillers, finished ends and toe kick in this price?
  4. Which hinges and drawer runners, by brand, and are they soft-close?
  5. What is the deposit, what is the schedule, and when is the final measure?
  6. What is the lead time from final measure to install, in weeks, in writing?
  7. Who fixes a damaged door, a crooked run or a peeling finish, and for how long?
  8. Can I see a kitchen you installed two years ago?

Ask them in that order. The shop that answers the first one without blinking is usually the one to hire.

Already have the quotes and not sure what you are looking at? Send them in. You get a line-by-line read, the normalized grid filled in, and a plain answer on which one to sign, or whether to go back to all three.

Get my quotes reviewed, $149

Questions people ask

How many kitchen quotes should I get?

Three, on one written scope. Two leaves you unable to tell which one is the outlier. Five is a part-time job and the shops can tell you are shopping on price alone, which gets you the thin-back box at the low number.

How much can kitchen quotes vary for the same job?

On a genuinely identical scope, 10 to 15% between honest shops. If you are seeing 30% or more, they are not quoting the same kitchen. Fill in the grid and the gap usually closes to the real difference in box and door.

Should I tell each shop what the others quoted?

Not the number. Tell them the scope and that two other shops are pricing the same one. A good shop quotes its best price once. A shop that drops 15% the moment you mention a competitor was never giving you its best price.

Is the lowest quote ever the right one?

Often, once it is normalized. The cheapest same-scope quote from a shop with a decent box, a written warranty and a kitchen you can go look at is a fine choice. The cheapest as-received quote almost never is, because it is cheap for a reason that shows up as a second invoice.

What if the shop will not quote my scope and insists on its own design?

Let them, as a separately priced option under your scope. If they will not price your scope at all, they are telling you they only sell one kitchen. Sometimes that is fine. You just cannot compare it.

Can a shop charge more than the quote later?

In Ontario, if a written estimate is part of the contract, not more than 10% over it without your written agreement to a change. Changes you ask for are extra and should be written and priced before the work is done, not after.

The whole thing in one sentence

Write the scope, make all three price it, put the three on one grid, and compare the last row. Everything else on this page is detail. If you do only that, you will not sign the wrong quote, and you might sign the right one with a thousand dollars left over for the pulls you actually wanted.