Renovation Insurance in Ontario: Additions, Second Storeys, Basements and Living Through the Work

Construction Insurance

Renovation Insurance in Ontario: Additions, Second Storeys, Basements and Living Through the Work

Your home policy was written for a finished house with people living in it. The day the wall comes down, both of those can stop being true.

Most renovation insurance trouble starts with one phone call that never got made. The homeowner assumed the policy they already pay for would ride along through the work, the insurer assumed it would be told, and the two assumptions met over a claim.

Call the Insurer Before the First Swing, Not After the First Leak

A standard home policy excludes or limits a house under construction, and insurers say you must tell them before major work or the coverage can be voided. The mechanism is simple: the premium was set on a closed, heated, occupied house with working plumbing, and a renovation changes every one of those for a while.

What counts as “major” is where people get caught. One Canadian insurer’s guide drops vandalism, glass and water damage even during minor work, and will not keep a home policy going at all if you move out or the structure changes. An Ontario Court of Appeal decision cut the other way on one point: a renovation is not automatically “under construction” for a home policy exclusion. Do not leave that to a judge. Get the insurer’s position on your job in writing before anything is torn out.

The jobWhat usually happens to the policyPublished cost, November 2026
Kitchen or bathroom, same footprint, you stayNote on file or a minor-work endorsement; water, glass and vandalism limited while work runs$50 to $250 minor, $150 to $500 major (a Canadian renovation marketplace)
You move out 30 days or moreVacancy permit, or a vacant-home policy$30 to $50 a month (a Canadian rate-comparison site); vacant-home policy up to 3 times normal (a national brokerage)
Addition or second storeyEndorsement if the insurer allows; otherwise a stand-alone builder’s risk policy on the new workOur planning number 0.9% of the addition’s hard cost
Garden suite or detached buildingDetached-structures limit, usually 10% to 25% of the dwelling limit; a suite is added separatelyAbout $75 or more a month, finished (one Canadian site)

Published ranges from one source type each, not quotes; Ontario retail sales tax of 8% applies to most property premiums on top.

Why insurance prices are all over the map: the brokerages, insurer guides and lenders we checked did not agree. An Ontario and Quebec brokerage and a Canadian renovation marketplace put a course-of-construction premium at 0.5% to 1% of hard cost; two Ontario brokerages and a Canadian comparison site ran from 1% up to 4%; a US personal-finance site said 1% to 5%. On a $500,000 house that is $2,500 at one end and $20,000 at the other. The reasons: percent of hard cost against a flat minimum, the term, the deductible, construction type, fire protection grading, and whether soft costs and liability are in or out. Budget about 1% of hard cost, about $4,500 on a $500,000 house, and get two or three quotes on the same written description.

Living in the House While the Work Goes On

If you are sleeping there, cooking there and getting the mail, most insurers will keep the home policy going through a renovation they have been told about. The catch is what can stop being covered while the work runs: on at least one Canadian insurer’s form, water damage, vandalism and glass. Know where the shut-off is, and hire a contractor who caps lines before he leaves.

The 30-day clause bites hardest. Most policies treat a house as vacant once nobody has lived in it for 30 consecutive days. In an Alberta case the owner lived in a trailer on the lawn during the renovation, the house burned, and the court agreed with the insurer that he had not been living in the dwelling. A trailer on the lawn is camping.

  1. Tell the insurer before the work starts and ask, in writing, whether you are still “living there” if you sleep at your sister’s for three weeks while the floors cure.
  2. Count the days. If you will be out 30 or more, buy the vacancy permit before day one, not after day 31.

Additions and Second Storeys: Where the Home Policy Runs Out of Road

The moment the structure changes, you are building, not decorating. Some insurers will endorse the home policy to add the value of the new work as it goes in. Others will not keep a home policy on a house with the roof off and will send you to a stand-alone builder’s risk policy on the addition. Either works; two policies that do not know about each other does not.

A stand-alone policy on an addition is priced like any course-of-construction policy: a percent of the hard cost of the new work, land and the existing house excluded. On a $250,000 addition, our planning numbers of 0.5%, 0.9% and 1.5% give $1,250, $2,250 and $3,750 for a 9 to 12 month term. The top of the published range, 4%, would be $10,000; that is a published ceiling, not our estimate.

A second storey is the worst case for weather: the roof comes off, and one thunderstorm soaks two floors of finished house that were never part of the job. Bind before the demolition crew arrives. We have watched weather get into framing that was supposed to be closed in “by Friday”. Friday is a hope, not a plan.

Terms run 3, 6, 9 or 12 months, and usually one extension is granted at additional premium, so put the expiry on the fridge. If the contractor carries the policy on your addition, the who-pays page covers what the contract must say. The builder’s risk versus home insurance page covers the hand-back at the end.

Demolition, Detached Garages and Heated Workshops

Partial demolition is the riskiest week of a renovation. Water lines get cut, gas lines get found, the house is open, and the demolition crew’s own liability policy should answer for damage they cause. Tell your insurer the dates.

A detached garage, shop or studio is a separate building. Anything over 10 square metres needs a permit, and permits are the owner’s responsibility; the permit page sorts out which jobs need one. The detached-structures limit on a home policy is usually 10% to 25% of the dwelling limit. At 10% of a $600,000 dwelling limit, that is $60,000, which does not rebuild a $120,000 heated workshop. Insure the shop as a building under construction while it goes up, then raise the limit, and get the wood stove WETT-inspected.

Basement Apartments and Garden Suites Change the Policy Twice

Finishing a basement adds rebuild value, so the dwelling limit and the premium go up. Renting the unit is the bigger change: renting out part of your home without telling the insurer can void the coverage. The legal basement apartment page covers the Building Code side; the insurer wants to know the day you decide, not the day a tenant’s kettle sets off the sprinkler you do not have.

A garden suite is a separate structure, and that is how the insurer sees it. That detached-structures limit rarely covers a suite that costs $200,000 to $300,000 to build; one Canadian site puts the finished suite at about $75 or more a month extra. While it goes up it needs its own course-of-construction cover.

The Contractor’s Liability, and Yours

A renovation contractor should carry general liability insurance; at least $2,000,000 is the common recommendation for residential work. Ask for a certificate dated past the end of your job. The certificate is the receipt; the policy is the groceries.

WSIB works differently on a renovation than on a new build. A contractor hired and paid directly by the resident of a home for repairs or renovations needs no clearance certificate, and an independent operator doing only that work may be exempt from coverage; anyone with employees must still register. Confirm the exemption with WSIB, not the contractor. If you hire trades yourself, you may be the “constructor” under the Occupational Health and Safety Act, and the Occupiers’ Liability Act puts a duty of care on whoever controls the site. A worker hurt in your house with no WSIB coverage and no liability policy behind him can sue you, the homeowner.

We build houses and carry builder’s risk, liability and WSIB on every one of them; we do not sell insurance and take no referral fees. The binding answer on any policy comes from a RIBO-licensed broker. The construction insurance hub explains the three policies and who carries each; the renovations section covers the building side.

This page is general information from a builder, not insurance, legal or tax advice. Policies differ, and the wording in yours wins. Confirm your situation with a RIBO-licensed broker and, if there is a mortgage on the house, your lender.

Questions people ask

Do I need builder’s risk insurance for a home addition?

Usually, in one of two forms. Some insurers endorse your home policy to add the new work as it goes in. Others will not keep a home policy on a house with the roof off and want a stand-alone builder’s risk policy on the addition. Bind it before demolition starts.

Does a kitchen renovation require special insurance?

A same-footprint kitchen or bathroom usually needs a call to the insurer and, at most, a minor-work endorsement that a Canadian renovation marketplace puts at $50 to $250. Not calling is the expensive option: undisclosed major work can void the policy.

Can I remain insured while living in a house under renovation?

Yes, if the insurer has been told and you are genuinely living there: sleeping, cooking, getting the mail. A trailer on the lawn does not count, and an Alberta court agreed with the insurer on exactly that after a fire. Ask in writing what “living there” means on your policy.

When is vacant home insurance required during renovations?

Once nobody has lived in the house for 30 consecutive days, most policies treat it as vacant and coverage shrinks or stops. Buy a vacancy permit before day one if you will be out that long; a Canadian rate-comparison site puts it at $30 to $50 a month. A full vacant-home policy can run up to 3 times the normal premium.

Does adding a legal basement apartment change my homeowners insurance?

Twice. Finishing the space raises the rebuild value and the premium. Renting it out adds landlord liability and rental income to the policy, and renting without telling the insurer can void your coverage. Tell them when you decide to build it and again when a tenant signs.

Put a number on the addition before you call anyone

The calculator takes the hard cost of the new work, the term, the deductible and the site, and writes a quote request sheet you send to a broker of your own choosing.

Sources and further reading