How to Compare Flooring Quotes: The Grid, What Is In and What Is Out, Subfloor, Moisture, Trim and Warranty, With Three Quotes for the Same House

Flooring & Tile

How to Compare Flooring Quotes: Put All Three on One Grid and the Cheap One Usually Stops Being Cheap

A flooring quote is a short document that leaves out more than it says. One installer prices the planks and the labour and nothing else; the next includes tearing out the carpet, screwing down the subfloor and putting the baseboard back; the third is quoting a better plank and did not say so. The totals are $9,900, $12,250 and $14,800, and the homeowner picks the first one and spends the difference anyway, in extras, on a Tuesday, with the furniture in the garage. The fix is a grid with every line on it, filled in from each quote, with “not included” written wherever the quote is silent.

The grid

Draw this on a sheet of paper, one column per quote. Where a quote does not mention a line, write “not included” and price it yourself from the table on the cost per square foot page. You are not trying to catch anyone; you are making three documents answer the same questions.

LineWhat to look forTypical mid-grade rate
Material: product, grade, thickness, wear layerBrand and product name, not “engineered hardwood”. For engineered, the wear layer in mm; for LVP, the mil wear layer and whether the pad is attached; for tile, the exact size and PEI rating.Engineered $5.25, LVP $3.25, porcelain $4.50 plus $1.25 setting
Quantity and wasteSquare feet of material, not of floor. 10% waste for straight lay, 15% for diagonal or herringbone, 12% for tile.Floor area x 1.10
Labour and methodNail, glue or float; thinset type for tile; whether the rate changes for pattern or large format.Nail-down $5.50, glue-down $6.50 + $1.00 adhesive, float $4.00, LVP click $2.75, tile $10.00
Removal and disposalEach existing floor by type, and who pays for the bin.Carpet $0.90, laminate $1.25, glued vinyl or hardwood $2.00, tile $3.50; bin $450
Subfloor prepScrew-down and ridge sanding at minimum. Levelling and plywood overlay as allowances, by the square foot.Minor prep $0.75, self-levelling $3.00, 3/8 in. plywood $2.75
Moisture testingNamed: pin meter on wood, in-situ probe or calcium chloride on concrete. Who does it and what happens if the slab fails.Usually in the labour; mitigation $4.00 if the slab is wet
Baseboard and trimRemove and reinstall, new, or quarter-round over existing. Transitions counted. Door bottoms.R and R $2.50/lf, new $6.50/lf, quarter-round $2.00/lf, transitions $35 each, doors $25 each
Delivery, furniture, protectionWho moves the piano. Occupied house is a real cost.Delivery $150, occupied +10%
WarrantyWorkmanship, in years, in writing, and whether it survives him going out of business.One year is normal
HSTShown, or “plus HST”, or silent. Silent usually means plus.13%

The worked job: 900 sq ft of engineered hardwood over carpet

Main floor of a bungalow, living room, dining room, hall and two bedrooms, 900 sq ft, carpet and pad coming out, plywood subfloor underneath, 120 linear feet of existing baseboard, four doorways to tile and the stairs needing a transition. Here is what a complete mid-grade quote should contain, with the arithmetic shown.

LineQuantityRateAmount
Engineered hardwood, mid grade, 3 mm wear layer, 5 in. plank990 sq ft (900 + 10%)$5.25$5,197.50
Nail-down labour900 sq ft$5.50$4,950.00
Remove carpet and pad, dispose900 sq ft$0.90$810.00
Subfloor: pull staples, screw down, sand ridges900 sq ft$0.75$675.00
Baseboard remove and reinstall120 lf$2.50$300.00
Transitions and reducers4$35$140.00
Delivery1$150$150.00
Total before HST$12,222.50
HST 13%$1,588.93
Total with HST$13,811.43

Call it $12,250 before HST, which is the second quote in the lede. Now look at the other two.

Three quotes for that job, on the grid

LineQuote A: $9,900Quote B: $12,250Quote C: $14,800
Material“Engineered oak”, 900 sq ft, no brand, no wear layerNamed product, 3 mm, 990 sq ftNamed product, 4 mm, 7 in. plank, 990 sq ft at $8.00
LabourNail-down, 900 sq ftNail-down, 900 sq ftNail-down, 900 sq ft
RemovalNot includedIncludedIncluded
Subfloor prepNot included, “as required”Included, with a levelling allowance if neededIncluded
Moisture testNot mentionedPin meter, readings on the invoicePin meter
Baseboard, transitionsNot includedIncludedIncluded
WasteNone allowed for10%10%
HSTSilentShownShown
Warranty“Guaranteed”1 year workmanship, written2 years workmanship, written

Quote A is the planks and the labour, 900 times about $11, and nothing else. Add the lines it left out at the rates above: removal $810, prep $675, baseboard $300, transitions $140, the 90 sq ft of waste he will run short by at $5.25 is $472.50, delivery $150. That is $2,547.50 of extras, and Quote A is now $12,447.50, two hundred dollars more than B, with an unnamed product and no written warranty. Quote C is Quote B with a better floor: the 990 sq ft at $8.00 instead of $5.25 is $2,722.50 more material, which almost exactly explains the difference. C is not overpriced. It is a different floor.

The rule: never compare totals. Compare the grid. When two quotes are within 10% of each other on the same grid, pick the installer, not the number. How to pick the installer.

Where homeowners go wrong

  1. Letting “as required” stand on the subfloor line. It means a number you will learn on day one. Ask for a rate per square foot and a cap, or an allowance.
  2. Comparing a glue-down quote to a nail-down quote. Over a slab, glue-down is $6.50 plus $1.00 adhesive against $5.50 for nailing on plywood. The $2 difference is the method, not the installer. The three methods.
  3. Missing that the quantity is floor area. 900 sq ft of material for 900 sq ft of floor leaves you three boxes short in a dye lot that no longer exists.
  4. Reading “waterproof” on the LVP quote and skipping the moisture line. The plank is waterproof. The mould under it is not impressed. What happens on a damp slab.
  5. Forgetting the trim. A floor is not finished until the baseboard is back and the doors close. Those lines are $500 to $1,500 on an ordinary house and the cheap quote never has them.

Questions people ask

How many flooring quotes should I get?

Three, from three different kinds of outfit if you can: a store, an independent installer and a renovator. Two tell you nothing; five is a week of your life and the fifth man can tell you have been shopping.

Why is one flooring quote so much cheaper?

Usually it covers less: no removal, no subfloor work, no trim, no waste, HST not shown. Sometimes it is a lower grade of the same material with no brand named. Rarely, the man is just hungry this month, and that one is worth checking out carefully.

Should a flooring quote include HST?

It should show it. A quote that says “plus HST” is fine; a quote that is silent and later adds 13% is a $1,600 surprise on the job above. A quote with no HST at all and a cash wink has no warranty you can enforce.

What should be in a flooring quote?

The product by name and grade, the quantity with waste, the install method and rate, every prep and removal line, trim and transitions, delivery, HST, a payment schedule, the start and finish dates, and the workmanship warranty in years. If it is on one page with a total and nothing else, send it back.

Will you look at my quotes?

Yes, that is the $99 quote review: up to three quotes, and a written note back on what is included, what is not, and what the extras will likely come to.

Build your own column first

Run your rooms through the flooring cost calculator before the quotes arrive; it produces exactly the grid above, line by line, at these rates. Then every quote gets measured against a number you understand.

Sources and further reading