When the 80-Inch Door Won’t Do: Stock vs Custom Interior Doors for Ontario Builders

Stock vs Custom Interior Doors: A Guide for Ontario Builders
Tall ceilings, century-home openings and wide passages: when to switch from stock 80-inch doors to custom sizes, and how to plan it.
Most interior door packages in Ontario still start from the same assumption: a slab roughly 80 inches tall, a width somewhere between 24 and 36 inches, and a pre-hung jamb that drops into a framed opening of matching size. That assumption holds on plenty of jobs, and when it does, stock product is the fastest way to close out a trim schedule. The trouble starts on the projects where it does not hold, and knowing early when to switch to custom interior doors saves more grief on site than any amount of shimming at the end.
Where the standard slab runs out
On new subdivisions across the GTA and Ottawa, 9 ft main floors are now routine and 10 ft ceilings appear in a lot of higher-end plans. An 80-inch door under a 10 ft ceiling leaves roughly 40 inches of wall above the head jamb, and clients notice it the moment the drywall is painted.
Renovations bring the opposite problem. Older houses rarely have square, plumb openings, and a stock frame will only hide so much. The usual triggers that push a job toward custom sizing:
- ceilings of 9 ft and higher where the drawings call for full-height or near full-height doors;
- openings wider than 36 inches, such as a den off a great room or a wider accessible passage;
- existing openings that are out of square or sit on a floor that has settled;
- flush, trim-free openings where the door has to sit in the same plane as the wall.
Width is as much about the people as the plan. A 36-inch slab leaves a clear opening of roughly 34 inches once the stops and the thickness of the open door are taken off, which is close to what barrier-free standards ask for. If a client plans to stay in the house as they age, ask about it now. Widening one bedroom door and one bathroom door at the framing stage costs very little. Doing it after the tile is down is a renovation.
Matching the decision to the project type
New builds with tall ceilings
On a new build you control the framing, which makes custom the easy case. Decide door heights before the framing package goes out, not after drywall, so rough openings are built to the door instead of the door being forced into the opening. For a concealed, trim-free look the rough opening depends on the system. Trio Doors, for example, lists its primed Astori concealed doors as needing a rough opening about 4 inches wider and 2 3/8 inches taller than the door, and they do not arrive pre-hung. These numbers belong on the framing drawings.
Taller doors also change what sits above them. Raising a door from 80 to 96 inches takes 16 inches out of the wall over the opening, and in a bearing wall that is where the lintel goes. Before the heights are fixed, have the designer or the framing supplier confirm that the lintel still fits and is sized for the load it carries. In a non-bearing partition this is simple. Under a floor or roof load it can mean an engineered lintel, and that is a drawing change, not a site decision.
Gut renos and century homes
A gut reno sits between a new build and a patch job. If the walls are down to studs, you can reframe openings to standard sizes and buy stock, which is often the right call. In a century home in Toronto’s east end or a Victorian in Kingston, though, the owner usually wants to keep tall transoms, original casing profiles or the proportions of the old doorways. Reframing every opening to 80 inches flattens the character they paid for. Custom heights and widths let you keep the house looking like itself while still hanging a modern slab with decent sound control. Budget extra time for measuring: floors in older houses can drop noticeably across a single doorway.
Old openings need more than one measurement. Take the width at the top, middle and bottom, the height on both sides, and both diagonals, and note which way the floor falls. Measure the wall thickness at every opening as well, because plaster walls vary from room to room. Send the supplier the smallest width and height along with photos. A custom frame can be made to suit the opening, but only if the supplier knows what the opening really is.
Condo suites
Condo work runs the other way. Most openings are standard, and the building has rules about deliveries and working hours. Stock doors usually win here. Custom earns its place in a condo mainly for full-height doors in suites with higher ceilings, or for concealed doors when the owner wants a clean wall in a small space.
Stock or custom: a quick reference
| Situation | Stock or custom | Why |
|---|---|---|
| 8 ft ceilings, standard framed openings | Stock | Standard sizes fit, short lead time, easy to replace later |
| 9-10 ft ceilings, full-height look requested | Custom | Taller slabs keep the proportions; stock leaves a large header |
| Openings over 36 in. wide | Custom | Few stock options; wide slabs need matched hardware |
| Century home, original openings kept | Custom | Odd sizes and out-of-square openings do not suit stock jambs |
| Gut reno, openings reframed | Either | Depends on whether the owner wants the original proportions |
| Condo suite, standard openings | Stock | Delivery rules and tight schedules favour product on hand |
| Flush, trim-free walls | Custom | Concealed frames are sized to the system, not the wall |
Keeping custom doors off the critical path
The real risk with custom doors is not cost but schedule. A made-to-order door can take several weeks to arrive, and lead times differ from model to model. In the Trio Doors catalogue, in-stock models sit alongside lines marked with lead times of around 6 weeks or 10-12 weeks, and non-standard sizes are produced to order, with doors on a standard frame made up to 10 ft tall and on a concealed frame up to 11 ft. That covers most tall-ceiling work in Ontario homes, but only if the order goes in early.
Storage on site is part of the schedule too. Wood and MDF doors move with humidity, and a house under construction in Ontario swings from damp during drywall and paint to very dry once the furnace is running. Keep the doors flat in the heated house for a few days before they are hung, keep them out of the garage, and do not hang them while the taping compound is still drying. A door fitted tight in a damp house will show a wide gap in February.
Installation deserves the same planning. Tall and wide slabs show every flaw in the opening, and a door hung to follow a crooked wall will look crooked for good. Experienced installers set the frame by level, not by the wall, and the company’s own installation terms tie the warranty to a level installation, noting that uneven walls or openings that miss the specifications will affect how the casings sit. Handles, casings and seals go on the same day as the door unit, so walls should be finished and painted before the installer arrives.
Height adds weight. A solid-core slab at 8 ft or taller is noticeably heavier than a standard door, so it usually carries four hinges instead of three, and the hinge side of the frame needs solid backing in the wall. Ask the supplier how many hinges each height comes with and whether the frame is reinforced, and plan on two people for every door.
Ordering checklist before you sign off the door schedule
- Confirm ceiling heights and finished floor levels on site, not only from drawings.
- Fix door heights and widths for every opening before framing starts.
- Check whether each door is pre-hung or a slab with a separate frame, and frame rough openings to the supplier’s specs.
- Note the swing for every door, including whether concealed doors open into or out of the room.
- Match core type to use: solid core for bedrooms and offices, lighter options for closets.
- Choose finishes and hardware together, so handles suit the slab thickness.
- Get the lead time in writing and add it to the schedule with a buffer.
- For clients outside the GTA, book a video consultation or a showroom visit early, so samples do not hold up the order.
Finished floor height matters just as much as the opening. Hardwood, tile and carpet all finish at different heights, and a door ordered to the subfloor measurement can end up dragging on the floor or sitting too high. Give the supplier the finished floor build-up for each room, and say where a larger gap is needed under the door for return air. Mention any room that will get a thick rug or a raised threshold as well, since both change how much clearance the door needs.
Stock doors are not the enemy; they are the right answer for most standard openings. The skill is spotting the exceptions at the drawing stage, when changing a number costs nothing, rather than at trim-out, when it costs a week.
BuildersOntario.com is run by ICFHome.ca - ICF custom-home specialists since 1995. Straight answers on budget, permits, and ICF. No pressure.