Architect vs BCIN Designer in Ontario: Who Should Draw Your House?
A Part 9 house (up to three storeys, 600 square metres) does not need an architect. It needs permit drawings by someone qualified under Division C of the Building Code, which in practice means a designer with a BCIN, an architect, or an engineer, and the owner can draw their own. A BCIN designer is















